Our Business

  • All
  • Commercial
  • Office
  • Complex/Other
  • Parking
  • Land

Shin-Sotetsu Building
(Sotetsu JOINUS)

1-5-1 Minamisaiwai, Nishi-ku, Yokohama-shi
Completion date November 1973
Structure 12-story steel-framed reinforced concrete building with flat roof and 3 basement floors
Total floor area 185,193.21㎡

Yokohamaeki Nishiguchi Chikagai
(Sotetsu JOINUS)

1-4-B1 Minamisaiwai, Nishi-ku, Yokohama-shi
Completion date November 1964
Structure 2-story steel-framed reinforced concrete building (1st and 2nd basement floors registered)
Total floor area 27,110.79㎡

Yokohamaeki Nishiguchi Chika Parking lot

1-4-B1 Minamisaiwai, Nishi-ku, Yokohama-shi
Completion date November 1964
Structure 2-story reinforced concrete building (3rd and 4th basement floors added)
Total floor area 28,352.56㎡

THE YOKOHAMA FRONT

1-41, 42 Tsuruya-cho, Kanagawa-ku, Yokohama-shi
Completion date March 2024
Structure 43 above ground, 2 basement levels reinforced concrete construction, partially steel frame construction
Total floor area 79,082㎡

Sotetsu Minamisaiwai 1st Building

1-9-8 Minamisaiwai, Nishi-ku, Yokohama-shi
Completion date July 1961
Structure Reinforced concrete construction, 5-story building with flat roof and 1 basement floor
Total floor area 902.11㎡

Sotetsu Minamisaiwai 2nd Building
(Sotetsu MOVIL)

2-1-22 Minamisaiwai, Nishi-ku, Yokohama-shi
Completion date October 1988
Structure 6-story steel reinforced concrete building
Total floor area 13,571.06㎡

Sotetsu Minamisaiwai 3rd Building

1-10-16 Minamisaiwai, Nishi-ku, Yokohama-shi
Completion date March 1989
Structure 2-story steel structure with flat roof
Total floor area 906.28㎡

Sotetsu Minamisaiwai 5th Building

1-13-8 Minamisaiwai, Nishi-ku, Yokohama-shi
Completion date June 2000
Structure 2-story steel frame galvanized steel roof
Total floor area 93.12㎡

Sotetsu Minamisaiwai 6th Building

1-9-7 Minamisaiwai, Nishi-ku, Yokohama-shi
Completion date June 1960
Structure Reinforced concrete/steel frame flat roof 2-story building
Total floor area 305.08㎡

Sotetsu Minamisaiwai 7th Building

2-17-1 Minamisaiwai, Nishi-ku, Yokohama-shi
Completion date March 1995
Structure Steel frame/reinforced concrete construction, 7 stories with flat roof and 1 basement floor
Total floor area 2,701.05㎡

Sotetsu Minamisaiwai 8th Building
(Yokohama VIVRE)

2-15-13 Minamisaiwai, Nishi-ku, Yokohama-shi
Completion date September 1978
Structure 11-story steel-framed reinforced concrete building with 1 basement floor
3-story steel-framed reinforced concrete building
Total floor area 36,544.48㎡

Sotetsu Minamisaiwai 9th Building

1-10-5 Minamisaiwai, Nishi-ku, Yokohama-shi
Completion date August 1969
Structure 2-story steel frame galvanized deck roof
Total floor area 423.22㎡

Sotetsu Minamisaiwai 10th Building

2-1-5 Minamisaiwai, Nishi-ku, Yokohama-shi
Completion date September 2015
Structure Steel frame, alloy-plated steel plate roof, one-story house
Total floor area 794.00㎡

Sotetsu Minamisaiwai 11th Building

1-9-13 Minamisaiwai, Nishi-ku, Yokohama-shi
Completion date June 1985
Structure 3-story steel structure with flat roof
Total floor area 1,037.13㎡

Sotetsu Minamisaiwai 12th Building

1-10-8 Minamisaiwai, Nishi-ku, Yokohama-shi
Completion date November 1963
Structure Reinforced concrete construction, flat roof, 6 floors, 1 basement floor
Total floor area 575.75㎡

Sotetsu Minamisaiwai 13th Building

2-1-5 Minamisaiwai, Nishi-ku, Yokohama-shi
Completion date October 2015
Structure Steel frame, alloy plated steel sheet roof, one-story building
Total floor area 225.43㎡

Sotetsu Minamisaiwai 14th Building

1-13-15 Minamisaiwai, Nishi-ku, Yokohama-shi
Completion date July 1963
Structure Reinforced concrete construction, 6-story building with flat roof and 1 basement floor
Total floor area 586.06㎡

Sotetsu Minamisaiwai 15th Building

1-13-10 Minamisaiwai, Nishi-ku, Yokohama-shi
Completion date December 1963
Structure Reinforced steel frame concrete construction, 9 stories with flat roof and 1 basement floor
Total floor area 1,600.53㎡

Sotetsu Minamisaiwai 16th Building

1-10-1 Minamisaiwai, Nishi-ku, Yokohama-shi
Completion date May 1961
Structure Reinforced concrete construction, flat roof, 4-story building with basement and roof
Total floor area 2,243.25㎡

Sotetsu Minamisaiwai 17th Building

1-9-2 Minamisaiwai, Nishi-ku, Yokohama-shi
Completion date November 1983
Structure Steel frame/Lightweight steel frame, flat roof
Total floor area 261.14㎡

Sotetsu Kitasaiwai 1st Building
(EQUINIA Yokohama)

1-1-8 Kitasaiwai, Nishi-ku, Yokohama-shi
Completion date February 1972
Structure Steel-framed reinforced concrete building, 3-story building with 1 basement floor
Steel-framed reinforced concrete building, 9-story building with 2 basement floors
Total floor area 16,617.61㎡

Sotetsu Kitasaiwai 2nd Building
(Ryoshin Yokohama Building)

1-1-6 Kitasaiwai, Nishi-ku, Yokohama-shi
Completion date April 1974
Structure Steel-framed reinforced concrete construction, 9-story building with flat roof and 1 basement floor
Total floor area 4,492.46㎡

Sotetsu Kitasaiwai 3rd Building

1-1-5 Kitasaiwai, Nishi-ku, Yokohama-shi
Completion date September 1970
Structure Steel-framed reinforced concrete construction, 9-story building with flat roof and 1 basement floor
Total floor area 2,219.74㎡

Sotetsu Building

1-3-23 Kitasaiwai, Nishi-ku, Yokohama-shi
Completion date August 1998
Structure Steel frame/reinforced concrete construction, 27 floors, 6 floors underground
Total floor area 69,865.34㎡

Sotetsu KS Building

1-11-5 Kitasaiwai, Nishi-ku, Yokohama-shi
Completion date April 1984
Structure Steel-framed reinforced concrete construction, 1 floor underground, 9 floors above ground, and 1 floor tower.
Total floor area 11,496.27㎡

Sotetsu Honsha Building

2-9-14 Kitasaiwai, Nishi-ku, Yokohama-shi
Completion date July 1988
Structure 10-story reinforced concrete building with flat roof and 1 basement floor
Total floor area 20,276.77㎡

Taiyo Building

1-5-39 Minamisaiwai, Nishi-ku, Yokohama-shi
Completion date June 1961
Structure Reinforced concrete/steel reinforced concrete construction, flat roof, 7 stories with 2 basement floors

Sotetsu Minamisaiwai 2-chome Parking lot

2-3 Minamisaiwai, Nishi-ku, Yokohama-shi
Completion date
Structure
Total floor area 123.47㎡

Sotetsu Nishihiranuma Building

8-18 Nishihiranuma-cho, Nishi-ku, Yokohama-shi
Completion date August 2013
Structure Lightweight steel frame, alloy-plated steel sheet roof, 2-story building
Total floor area 1497.60㎡

Tsuruyacho 1-chome land

1-7-31 Tsuruya-cho, Kanagawa-ku, Yokohama-shi

Sotetsu Iwasakigakuen Building

2-17-1 Tsuruya-cho, Kanagawa-ku, Yokohama-shi
Completion date December 1986
Structure Steel frame reinforced concrete construction, 9 floors above ground with 1 floor underground
Total floor area 14,845.10㎡

Tsuruyacho Kyodo Building
(SY Building)

3-30-8 Tsuruya-cho, Kanagawa-ku, Yokohama-shi
Completion date July 1981
Structure Steel frame reinforced concrete construction with flat roof, 7 stories with 1 basement floor
Total floor area 1,189.79㎡

Yokohamaeki Nishiguchi 2nd Parking lot

3-31-8 Tsuruya-cho, Kanagawa-ku, Yokohama-shi
Completion date December 2003
Structure 3-story, 4-story steel structure
Total floor area 4,371.70㎡

Sawatari Building

5, Sawatari, Kanagawa-ku, Yokohama-shi
Completion date May 1987
Structure Steel frame reinforced concrete/reinforced concrete construction, flat roof, 3 stories with 2 basement floors
Total floor area 9,111.04㎡

Sotetsu Katakura 1st Building

2-71-3 Katakura-cho, Kanagawa-ku, Yokohama-shi
Completion date March 2016
Structure Steel frame galvanized steel roof one-story house
Total floor area 260.71㎡

Katakura 2-chome Parking lot

2-72-3 Katakura-cho, Kanagawa-ku, Yokohama-shi

Sotetsu Hoshiten A zone (parking lot)
(Hoshiten qlay)

Sotetsu Hoshiten B zone Hoshikawa Building
(HOSHITEN qlay)

1-1-1 Hoshikawa, Hodogaya-ku, Yokohama-shi
Completion date February 2023
Structure 2-story steel structure
Total floor area 4,827.41㎡

Sotetsu Hoshiten C zone
(HOSHITEN qlay)

1-2-2 Hoshikawa, Hodogaya-ku, Yokohama-shi / 194-1 Godo-cho, Hodogaya-ku, Yokohama-shi
Completion date December 2023/January 2024
Structure Steel frame 1-story building/Wooden 1-story building
Total floor area 867.78㎡

Sotetsu Hoshiten D zone
(HOSHITEN qlay)

134-9 Godo-cho, Hodogaya-ku, Yokohama-shi
Completion date April 2023
Structure Steel frame 1-story building
Total floor area 1,047.40㎡

Sotetsu Hoshiten E zone
(HOSHITEN qlay)

2-45-6 Tenno-cho, Hodogaya-ku, Yokohama-shi
Completion date June 2024
Structure steel construction
Total floor area 116.28㎡

Sotetsu Kamihoshikawa Building

1-1 Kamadai-cho, Hodogaya-ku, Yokohama-shi
Completion date September 2004
Structure 3-story steel frame, alloy-plated steel plate roof
Total floor area 599.42㎡

KNOCKS Hoshikawa (1st and 2nd floor store)

1-1-3 Hoshikawa, Hodogaya-ku, Yokohama-shi

Hoshikawa SF Building
(QUINT Hoshikawa)

2-4-1 Hoshikawa, Hodogaya-ku, Yokohama-shi
Completion date August 1989
Structure Steel frame reinforced concrete construction, 1 floor underground, 7 floors above ground
Total floor area 2,743.40㎡

Hoshikawa Sotetsu/Mitsui Kyodo Building

2-40-30 Hoshikawa, Hodogaya-ku, Yokohama-shi
Completion date November 2000
Structure 2-story steel structure with flat roof
Total floor area 1,333.96㎡

Hodogaya-ku Okazawacho Site

322-3 Okazawa-cho, Hodogaya-ku, Yokohama-shi

Sotetsu Sachigaoka Building

182-3 Sachigaoka, Asahi-ku, Yokohama-shi
Completion date June 1986
Structure 2-story steel frame reinforced concrete construction with flat roof
Total floor area 785.66㎡

Asahi-ku Sachigaoka Site

47-1 Sachigaoka, Asahi-ku, Yokohama-shi

Kibogaoka Land

64-16 Nakakibogaoka, Asahi-ku, Yokohama-shi

ARCOTT Futamatagawa

1-43-28 Futamatagawa, Asahi-ku, Yokohama-shi
Completion date July 1996
Structure Steel frame reinforced concrete construction with flat roof, 14 stories with 2 basement floors
Total floor area 13,769.25㎡

COPRE Futamatagawa (commercial building/office building) (JOINUS TERRACE 1)

2-50-14 Futamatagawa, Asahi-ku, Yokohama-shi
Completion date February 2018
Structure Steel frame 11 stories above ground
Total floor area 29,502.16㎡

Sotetsu Futamatagawa Building
(JOINUS TERRACE 2)

2-91-7 Futamatagawa, Asahi-ku, Yokohama-shi
Completion date April 2018
Structure Steel-framed 4-story building above ground
Total floor area 5,500.00㎡

Futamatagawaeki Kitaguchi Kyodo Building
(JOINUS TERRACE 3)

1-3-2 Futamatagawa, Asahi-ku, Yokohama-shi
Completion date July 1990
Structure Steel-framed reinforced concrete construction, 7-story building with flat roof and 1 basement floor
Total floor area 4,059.17㎡

Futamatagawa Minamiguchi Land

2-52 Futamatagawa, Asahi-ku, Yokohama-shi

Sotetsu Minamimakigahara 4th Building
(Sotetsu LIFE Minamimakigahara)

127 Kashiwa-cho, Asahi-ku, Yokohama-shi
Completion date April 2016
Structure Steel frame one-story house
Total floor area 1,760.00㎡

KNOCKS Minamaki Mirai (1st floor store)

127 Kashiwa-cho, Asahi-ku, Yokohama-shi
Completion date
Structure 1-story reinforced concrete building
Total floor area 194.25㎡

Sotetsu Minamimakigahara 3rd Building
(Sotetsu LIFE Minamimakigahara)

130 Kashiwa-cho, Asahi-ku, Yokohama-shi
Completion date August 2015
Structure 2-story steel structure above ground
Total floor area 1,315.00㎡

Minamimakigahara Land

47-1 Kashiwa-cho, Asahi-ku, Yokohama-shi

Sotetsu Yumegaoka Building
(Yumegaoka Soratos)

Soratos 1: 1584-2, Aza Ohara, Shimoiida-cho, Izumi-ku, Yokohama-shi
Solatos 2:1566 Aza Ohara Shimoiida-cho, Izumi-ku, Yokohama-shi
Solatos 3:1555-1, Aza Ohara, Shimoiida-cho, Izumi-ku, Yokohama-shi
Completion date May 2024
Structure Soratos 1: 4 stories steel framed
Soratos 2: 3 floors, steel framed
Soratos 3: 1 story light steel framed structure
Total floor area 105,014.94㎡

Sotetsu Shimoseya Building

3-40-1 Shimoseya, Seya-ku, Yokohama-shi
Completion date October 1973
Structure Steel frame slate roof flat house
Total floor area 824.04㎡

Sotetsu Mitsukyo Building A
(Sotetsu LIFE Mitsukyo)

2-19 Mitsukyo, Seya-ku, Yokohama-shi
Completion date November 1986
Structure 4-story reinforced concrete/steel frame flat roof building
Total floor area 23,495.92㎡

Sotetsu Mitsukyo Building B
(Sotetsu LIFE Mitsukyo)

2-1 Mitsukyo, Seya-ku, Yokohama-shi
Completion date June 1985
Structure 3-story reinforced concrete building with flat roof
Total floor area 3,689.31㎡

Sotetsu Seya 1st Building
(SMILE STREET SEYA)

1-4 Chuo, Seya-ku, Yokohama-shi
Completion date June 2010
Structure Steel frame flat roof 3-story
steel frame flat roof one-story house
Total floor area 2,231.26㎡

Sotetsu Seya 2nd Building

4-1-1 Seya, Seya-ku, Yokohama-shi
Completion date June 2012
Structure Steel frame one-story building
Total floor area 551.79㎡

Seyaeki Kitaguchi Transportation Plaza

3-11 Chuo, Seya-ku, Yokohama-shi

Sotetsu Seya Parking Building

3-12 Chuo, Seya-ku, Yokohama-shi
Completion date November 1998
Structure 5-story steel structure with flat roof
Total floor area 11,323.53㎡

Seyaeki Kitaguchi Building

3-6 Chuo, Seya-ku, Yokohama-shi
Completion date November 1998
Structure 9-story steel-framed reinforced concrete building with flat roof
Total floor area 1,600.92㎡

Seya Hinatayama Land

2-4-1 Minamiseya, Seya-ku, Yokohama-shi
Completion date
Structure
Total floor area 2,327.67㎡

Sotetsu Yayoidai 1st Building
(Sotetsu LIFE Yayoidai)

16-1 Yayoidai, Izumi-ku, Yokohama-shi
Completion date September 2017
Structure Steel frame construction, galvanized steel sheet roof, 2-story building
Total floor area 4,265.87㎡

KNOCKS Yokohama Yayoidai (1st floor store)

16-3 Yayoidai, Izumi-ku, Yokohama-shi
Completion date
Structure Reinforced concrete construction, 6 floors above ground and 1 floor underground
Total floor area 961.57㎡

Sotetsu Yayoidai 2nd Building

5-2 Yayoidai, Izumi-ku, Yokohama-shi
Completion date June 2018
Structure Steel frame, alloy plated steel sheet roof, one-story building
Total floor area 180.00㎡

Sotetsu Yamatedai Ryoke Building

2-10-1 Ryoke, Izumi-ku, Yokohama-shi
Completion date November 1993
Structure Steel frame/reinforced concrete construction, galvanized steel plate roof, 2-story building
Total floor area 4,632.88㎡

Sotetsu Yamatedai 1st Building

2-11-2 Ryoke, Izumi-ku, Yokohama-shi
Completion date December 1988
Structure 2-story steel structure with flat roof and galvanized steel plate roof
Total floor area 1,097.98㎡

Sotetsu Yamatedai ​​2nd Building

2-11-1 Ryoke, Izumi-ku, Yokohama-shi
Completion date March 1991
Structure 2-story reinforced concrete building with flat roof
Total floor area 953.45㎡

Sotetsu Yamatedai ​​3rd Building

2-13-2 Ryoke, Izumi-ku, Yokohama-shi
Completion date September 1992
Structure 2-story steel frame galvanized steel roof
Total floor area 694.10㎡

Sotetsu Yamatedai ​​4th Building

2-13-1 Ryoke, Izumi-ku, Yokohama-shi
Completion date September 1992
Structure 2-story steel frame galvanized steel roof
Total floor area 850.65㎡

Sotetsu Ryokuentoshi Station Parking Lot

1-1 Ryokuen, Izumi-ku, Yokohama-shi
Completion date December 2001

Sotetsu/Shibuya Ryokuentoshi Kyodo Building
(OBERISK)

1-1-16 Ryokuen, Izumi-ku, Yokohama-shi
Completion date February 1993
Structure Reinforced steel frame concrete construction, 6 stories
Total floor area 2,518.40㎡

Ryokuentoshi Hata Choji Building
(LOGGIA)

1-1-19 Ryokuen, Izumi-ku, Yokohama-shi
Completion date April 1993
Structure Reinforced concrete construction (partially steel frame construction), 4 stories above ground
Total floor area 887.73㎡

Sotetsu/Saito Ryokuentoshi Kyodo Building
(PRADO)

2-1-3 Ryokuen, Izumi-ku, Yokohama-shi
Completion date November 1993
Structure Reinforced concrete construction, 6 stories above ground
Total floor area 1,487.30㎡

Ryokuentoshi Uematsu Building
(AMNIS)

2-1-6 Ryokuen, Izumi-ku, Yokohama-shi
Completion date June 1993
Structure
Structure Reinforced concrete construction (partly steel frame construction) 6 stories above ground
Total floor area 1,277.28㎡

Sotetsu/Matsumoto Ryokuentoshi Kyodo Building
(ARCUS)

3-2-8 Ryokuen, Izumi-ku, Yokohama-shi
Completion date January 1993
Structure Reinforced concrete construction, partially steel frame construction, 1 floor underground, 3 floors above ground
Total floor area 917.10㎡

Sotetsu/Hata Ryokuentoshi Kyodo Building
(XYSTUS)

4-1-6 Ryokuen, Izumi-ku, Yokohama-shi
Completion date April 1992
Structure Reinforced concrete/steel structure, 1 floor underground, 6 floors above ground
Total floor area 2,269.95㎡

Ogawa Building

1-2-1 Ryokuen, Izumi-ku, Yokohama-shi
Completion date March 1998
Structure Steel-framed reinforced concrete construction, 5 stories above ground
Total floor area 1,645.68㎡

Sotetsu Ryokuentoshi 3rd Building

3-2-3 Ryokuen, Izumi-ku, Yokohama-shi
Completion date November 2002
Structure Lightweight steel frame, galvanized steel sheet roof, 2-story building
Total floor area 495.90㎡

Ryokuentoshi station west exit parking lot

3-2-8 Ryokuen, Izumi-ku, Yokohama-shi
Completion date September 1994

Sotetsu Ryokuentoshi Kyodo Building
(Sotetsu LIFE Ryokuentoshi)

4-1-2 Ryokuen, Izumi-ku, Yokohama-shi
Completion date May 1989
Structure Reinforced concrete, steel frame, 4 stories above ground
Total floor area 8,436.39㎡

Sotetsu Bunkakaikan Building

4-3-28 Ryokuen, Izumi-ku, Yokohama-shi
Completion date January 1990
Structure Steel-framed reinforced concrete construction, 4-story building with flat roof and 1 basement floor
Total floor area 3,804.45㎡

Ryokuen 7-chome Land

7-1-4 Ryokuen, Izumi-ku, Yokohama-shi

Sotetsu Ryokuentoshi 2nd Building

7-7-1 Ryokuen, Izumi-ku, Yokohama-shi
Completion date October 2001
Structure Steel frame flat roof one-story house
Total floor area 517.06㎡

Sotetsu Ryokuentoshi 1st Building

7-7-3 Ryokuen, Izumi-ku, Yokohama-shi
Completion date August 1995
Structure 2-story steel structure
Total floor area 825.94㎡

Sotetsu Ryokuentoshi 1st Building Annex

7-7-3 Ryokuen, Izumi-ku, Yokohama-shi
Completion date July 1999
Structure Steel frame galvanized steel roof one-story house
Total floor area 85.00㎡

Sotetsu Izumichuo Building
(Sotetsu LIFE Izumi Chuo)

5-4-13 Izumichuominami, Izumi-ku, Yokohama-shi
Completion date April 1993
Structure 6-story steel frame reinforced concrete construction with flat roof
Total floor area 12,088.60㎡

Sotetsu Izumichuo 2nd Building

5-13-1 Izumichuominami, Izumi-ku, Yokohama-shi

Sotetsu Izumichuo 3rd Building

5-4-11 Izumichuominami, Izumi-ku, Yokohama-shi
Completion date March 2020
Structure Steel frame 1-story building
Total floor area 258.61㎡

Izumino S Building
(Primo Izumino)

6206-2 Izumi-cho, Izumi-ku, Yokohama-shi
Completion date July 1987
Structure Steel-framed reinforced concrete construction, 5 stories above ground
Total floor area 1,755.14㎡

Izumino S Building Parking lot

Sotetsu Izuminoeki Kitaguchi Building
(Sotetsu LIFE Izumino)

6214-1 Izumi-cho, Izumi-ku, Yokohama-shi
Completion date May 2015
Structure 2-story steel frame structure with flat roof and alloy plated steel plate roof
Total floor area 9,082.80㎡

Kanekoyama Land (Kamome Park)

6505 Izumi-cho, Izumi-ku, Yokohama-shi

Sotetsu Konandai Building
(Konandai BIRDS)

3-1-3 Konandai, Konan-ku, Yokohama-shi
Completion date March 1976
Structure Reinforced concrete construction 5-story building with flat roof and 2 basement floors
Steel frame construction 6-story building with 2 basement floors
Total floor area 66,450.20㎡

Konandai 214 Building

3-3-1 Konandai, Konan-ku, Yokohama-shi
Completion date September 1994
Structure Reinforced concrete/steel construction, 5-story building with flat roof and 1 basement floor
Total floor area 17,842.40㎡

Sotetsu Tsurumi Shitte Building

2-2-8 Shitte, Tsurumi-ku, Yokohama-shi
Completion date May 2010
Structure 4-story steel structure with flat roof
Total floor area 17,883.94㎡

Sotetsu Shinyokohama Building
(Fujikasai Yokohama Building)

2-4-19 Shinyokohama, Kohoku-ku, Yokohama-shi
Completion date August 1985
Structure Steel frame/reinforced concrete construction, flat roof, 2 floors underground, 8 floors above ground
Total floor area 9,671.01㎡

Yamato-shi Sakuramori

2-2-20 Sakuramori, Yamato-shi

Sotetsu Sagamiotsukaeki crew facility (1st floor store)

3-1-1 Sakuramori, Yamato-shi

Yamatoeki Kyodo Building
(Yamatoeki Building PROSS)

1-1-1 Yamatohigashi, Yamato-shi
Completion date April 1996
Structure Steel-framed 5-story building with one tower
Total floor area 4,086.97㎡

Sotetsu Yamatominami Building

1-2-1 Yamatominami, Yamato-shi
Completion date September 2019
Structure Lightweight steel frame, alloy plated steel sheet roof, one-story building

Sotetsu Yamatohigashi Building

1-10-2 Yamatohigashi, Yamato-shi
Completion date June 1989
Structure Lightweight steel frame galvanized steel sheet roof one-story house
Total floor area 150.83㎡

Yamato Site

1-10-15 Yamato Higashi, Yamato-shi

Sotetsu Kokubunjidai 1st Building

1-10-15 Yamatohigashi, Yamato-shi
Completion date November 1976
Structure 2-story steel frame galvanized steel roof
Total floor area 1,362.07㎡

Sotetsu Sugikubokita Building

4-3-14 Sugikubokita, Ebina-shi
Completion date July 1989
Structure Steel frame construction, iron plate roof, 2-story building
Total floor area 1,200.20㎡

Sotetsu Sagamino Building
(Sotetsu LIFE Sagamino)

3-3-15 Higashikashiwagaya, Ebina-shi
Completion date November 1980
Structure Steel frame reinforced concrete construction, flat roof, galvanized steel sheet roof, tile roof, 2-story
reinforced concrete construction, 2-story flat roof
Total floor area 10,641.61㎡

Sagamino 2nd Parking lot

3-12 Higashikashiwagaya, Ebina-shi

Sotetsu Sagamino Parking Building

3-13 Higashikashiwagaya, Ebina-shi
Completion date November 1991
Structure 3-story steel frame reinforced concrete construction with flat roof
Total floor area 2,695.13㎡

Sagamino 3rd Parking lot

3-1816-2 Higashikashiwagaya, Ebina-shi

Sotetsu Kashiwadai Parking lot

555 Kashiwagaya, Ebina-shi

Sotetsu Kashiwadai Square Building

555-1 Kashiwagaya, Ebina-shi
Completion date October 2003
Structure 2-story steel frame galvanized steel roof
Total floor area 1,692.07㎡

Kashiwadai Square Land

Outside 555 Kashiwagaya, Ebina-shi

Sotetsu Kashiwadai Building

701-2 Kashiwagaya, Ebina-shi
Completion date April 1990
Structure Two-story steel frame/reinforced concrete structure, galvanized steel plate roof,
two-story steel structure with roofing roof
Total floor area 957.95㎡

Kawasaki kawaramachi Bunjo Kyodo Building

1 Kawaramachi, Saiwai-ku, Kawasaki-shi
Completion date October 1975
Structure 15-story steel-framed reinforced concrete building with flat roof (part of the first floor)
Total floor area 1,023.32㎡

Sotetsu Kajigaya Building

3-13 Kajigaya, Takatsu-ku, Kawasaki-shi
Completion date October 2018
Structure One-story steel frame building with flat roof and one basement floor
Total floor area 1,400.80㎡

Sotetsu Atsugi Hayashi Building

1-16-1 Hayashi, Atsugi-shi
Completion date September 1998
Structure 2-story steel structure with flat roof
Total floor area 2,915.71㎡

Sotetsu Chigasaki Takada Kyodo Building

4-5-67 Takada, Chigasaki-shi
Completion date April 1979
Structure 2-story steel frame galvanized steel roof
Total floor area 1,202.20㎡

Sotetsu Hiratsuka Okazaki Building

5800-1 Okazaki, Hiratsuka-shi
Completion date May 1990
Structure Steel frame galvanized steel roof one-story house
Total floor area 555.26㎡

Ofuna Land

1-26-5 Ofuna, Kamakura-shi

Sotetsu Yokosuka Shonan Yamate Building

2-5-1 Yoshii, Yokosuka-shi
Completion date June 2000
Structure 3-story steel frame structure with galvanized steel sheet roofing
Total floor area 3,731.54㎡

Sotetsu Kandasudacho 2nd Building
(Sotetsu Manseibashi Building)

1-5-10 Kandasuda-cho, Chiyoda-ku, Tokyo
Completion date January 2015
Structure 9-story steel structure with flat roof
Total floor area 7,287.53㎡

Sotetsu Iwamotocho Building

3-9-3 Iwamoto-cho, Chiyoda-ku, Tokyo
Completion date June 1993
Structure Steel frame/reinforced concrete construction, 8-story building with a flat roof and one floor below.
Total floor area 1,833.31㎡

Sotetsu Kojimachi Building
(TWG Kojimachi Building)

3-10-1 Kojimachi, Chiyoda-ku, Tokyo
Completion date August 2009
Structure Reinforced concrete building with 9 floors and 1 basement floor
Total floor area 992.30㎡

Sotetsu Tamachi Building

4-17-5 Shiba, Minato-ku, Tokyo
Completion date November 2007
Structure 8-story steel structure with flat roof
Total floor area 4,708.44㎡

Sotetsu Yoyogiuehara Building
(CABO uehara)

1-32-3 Uehara, Shibuya-ku, Tokyo
Completion date February 2023
Structure Reinforced concrete construction with flat roof and slate roof, 5-story building
Total floor area 1,122.40㎡

Sotetsu Toritsudaigakuekimae Building

2-13-18 Nakane, Meguro-ku, Tokyo
Completion date May 1985
Structure 5-story reinforced concrete building with flat roof
Total floor area 1,547.95㎡

Sotetsu Machida Yakushidai Building

2-13-1 Yakushidai, Machida-shi, Tokyo
Completion date April 2009
Structure 2-story steel frame, alloy-plated steel plate roof
Total floor area 1,496.96㎡

Chonanmachi Site and Building

1061 Jihiki, Chonan-machi, Chosei-gun, Chiba
Completion date October 1994
Structure Lightweight steel frame, galvanized steel sheet roof, 2-story building
Total floor area 114.33㎡

Chikusei-shi Site

517-1 Orimoto, Chikusei-shi, Ibaraki

Sotetsu Shimotsuke-shi Building

5-3-4 Ekihigashi, Shimotsuke-shi, Tochigi
Completion date July 1998
Structure Single-story steel frame building with galvanized steel sheet roofing
Total floor area 153.60㎡

Oyama-shi Site (Nakajima)

731-1 Nakajima, Oyama-shi, Tochigi

Sotetsu Sapporo Shiroishi Building
(Mitsubishi Fuso Truck and Bus Co., Ltd. Sapporo Higashi Branch)

1-1-93, Chuo 2-jo Shiroishi-ku, Sapporo-shi, Hokkaido
Completion date November 2001 and others
Building/purpose In addition to the head office building (purpose: office/factory), a total of 8 buildings
Total floor area 12,694.72㎡

Station property

Land owned by other companies

pagetop